Project
PVSB has completed new workshop, upgrading facilities for Sao Mai – Ben Dinh petroleum services Base.

On 30 of June 2015, PVSB has completed final stage and put into operation new workshop located inside Sao Mai – Ben Dinh construction area.

Industrial workshop including one story, 7 blocks, 40m long, 24m wide, total 960m2 of working area


PVSB’s workshop is equipped with 10 tones overhead crane, maximum lift height 6.5m

The new workshop would increase PVSB’s capabilities to providing services for construction and fabrication activities.

Beside, PVSB is evaluating bidder for “7Ha ground leveling” package and issued bidding package to upgrade electricity facilities for Sao Mai – Ben Dinh petroleum service Base.

Services
Project
Web links
Weather
City:


Statistic
Online: 176
Visitors: 7741159
Copyright © 2012 Web HP, All Rights Reserved